PU-TOPCOAT COLOR

Go back to product info

Preparation

  • 11 mm microfibre roller
  • drill with mixing spindle attachment
  • adhesive tape

Mixing

  • Check there is enough product available
  • Wear clean clothes and overshoes
  • Tape off edges
  • Remove any fluff or other foreign objects from microfibre roller using tape
  • Cleaning the floor from dust and grease

Mixing

  • Combine the A and B component in the correct proportion (see label)
  • mix for 2 minutes using a drill with mixing spindle attachment
  • Scrape walls of mixing container as you go along
  • in hot weather, up to a maximum of 5% water may be added to prevent too rapid drying

Cleaning

  • Saturate roll with ±400 g of product
  • Apply evenly left-right, 100 g/m²
  • oll and lift backwards and forwards
  • Remove tape sequentially

Additional points of attention

  • Clean with water

Disclaimer

Note:

  • Do not roll too fast to avoid splashes
  • Do not use in garages, wet areas or outdoors
  • Ensure adequate ventilation after laying

Video

Disclaimer

These brief installation instructions are provided to help you quickly get started with the installation. However, it is important to first read the technical data sheet and to take note of the safety data sheets Both documents can be found at the bottom of this page under downloads.

Downloads

Public downloads

  🇳🇱 🇫🇷 🇬🇧 🇩🇪
TDS

NL

FR

EN

DE

MSDS A

NL

FR

EN

DE

MSDS B

NL

FR

EN

DE

Contact our Sales Team and order now.

Contact our Sales Team and order now.