Sidec closed on Wednesday 1 May (Labour Day).

EPSL-FORTE

Go back to product info

Preparation

  • Drill with mixing spindle attachment
  • gloves
  • flat trowel or toothed comb
  • adhesive tape

Mixing

  • Check there is enough product available
  • Wear clean clothes and overshoes
  • Make the floor dust and grease free
  • Mask off if necessary
  • Avoid spilling the product

Mixing

  • Combine the A and B components in the correct proportion (see label)
  • mix for 2 minutes
  • Pour into large mixing bucket
  • Add the C component in the right proportion while stirring (see label)
  • Mix until homogeneous

Cleaning

  • Pour ±3.7kg/m² of product on the floor
  • Spread immediately with a comb or trowel
  • Rolling with a pin roller is normally not necessary but recommended if subsequent defects occur e.g. due to poor substrate preparation:
        • Cratering
        • Small level differences
        • Decreased flow
        • Foaming

This can be done after ±15 min. wearing spiked shoes

  • Apply a 2nd layer if necessary after 24 to 48 hours

Additional points of attention

  • Clean with acetone

Disclaimer

Video

Disclaimer

These brief installation instructions are provided to help you quickly get started with the installation. However, it is important to first read the technical data sheet and to take note of the safety data sheets It is useful to read through the technical information, “Working with epoxy” All these documents can be found at the bottom of this page under downloads.

Downloads

Public downloads

  🇳🇱 🇫🇷 🇬🇧 🇩🇪
TDS

NL

FR

EN

DE

MSDS A

NL

FR

EN

DE

MSDS B

NL

FR

EN

DE

MSDS C

NL

FR

EN

DE

Contact our Sales Team and order now.

Contact our Sales Team and order now.