Primer roller
mixing spindle attachment
gloves
Pour the mixture onto the floor and spread evenly with a primer/nylon roller, brush, window or floor squeegee
Depending on the system to be placed on top of the primer, +/-5 minutes after application you can scatter fire-dried sand (0.1-0.3 mm or 0.4-0.8 mm or even 0.8-1.2 mm)
Remove the excess sand after drying (+/- 16 hrs at 20°C
If the joints are still porous after this treatment, they should be treated again. This can be done by applying a new coat of primer (EP-TILE primeror EP-UNIVERSAL primer or EP-RAPID primer) to be applied. If the joints are deeper than 1mm, fill them with MORTAR EP-FILLER.
These brief installation instructions are provided to help you quickly get started with the installation. However, it is important to first read the technical data sheet and to take note of the safety data sheets It is useful to read through the technical information, “Working with epoxy” All these documents can be found at the bottom of this page under downloads.