VA.03/QC AC-VERTICAL BINDER 03

Go back to product info

Preparation

  • drill with mixing spindle attachment
  • flat trowels (stainless steel or plastic)
  • plant spraye
  • gloves

Mixing

  • check you have sufficient material (for consumption, see label)

Mixing

  • Put the granulates in a mixing tub or compulsory mixer,
  • Add the correct percentage (see label) of VA.03 as soon as possible,
  • Mix for +/-2 minutes until homogeneous

Clean tools

  • apply as a primer coat +/- 400 g pure PU resin on 1 m² (+/- 14 metres of skirting board or +/- 5-6 vertical steps) on the surface with a block brush
  • apply the gravel mixture wet-on-wet (i.e. before the primer layer is dry)
  • Press/compact well
  • Clean trowel or other tools regularly

Additional points of attention

  • half-empty packaging: the material can still be stored in closed packaging for the next project, otherwise dispose of as chemical waste.
  • Empty packaging: cured material can be removed quite easily from the buckets, it is then considered to be construction waste. Doing this means the buckets can still be reused.
  • Clean tools with water

Disclaimer

  • Do not use colours with copper pigments (can result in green stains) (ask Sales)
  • curing can take up to 48 hours after laying. Heat and ventilate the room well. If required, use a construction dryer.
  • Do not use for outdoor applications

 

Video

Disclaimer

These brief installation instructions are provided to help you quickly get started with the installation. However, it is important to first read the technical data sheet and to take note of the safety data sheets Both documents can be found at the bottom of this page under downloads.

Downloads

Public downloads

  🇳🇱 🇫🇷 🇬🇧 🇩🇪
TDS

NL

FR

EN

DE

MSDS

NL

FR

EN

DE

Contact our Sales Team and order now.

Contact our Sales Team and order now.