EP-RAPID PRIMER

Go back to product info

Tools

  • primer/nylon roller
  • drill with mixing spindle attachment
  • gloves

Preparation

  • Before installation, clean the floor with water and degreaser so that all surfaces are free of grease and dust.
  • After degreasing, the substrate must always be pretreated mechanically by blasting or sanding the substrate.
  • Dose an amount of EP-Rapid Primer that can be processed within 10 minutes.

Mixing

  • Mix the A component before weighing.
  • Weigh the B component according to the mixing ratio and pour it into the A component. Mix for 1 minute in the can.

Cleaning tools

Clean the tools used with Cleaner EP, isopropanol or acetone. Hardened product residues should be removed mechanically.

Points of attention

  • Place the surplus of prepared primer outside immediately after use. Temperatures can rise high in the pot and there is smoke development.
  • Always use masking tape in places where necessary.
  • For points of attention per surface, always check the complete technical data sheet

Preservation and storage

Shelf life: 12 months in a closed and original packaging when stored in a dry and cool place (10-25°C).

Video

Disclaimer

These concise installation instructions are there to help you get started quickly during installation. However, it is important to first read the entire technical data sheet and to take note of the safety data sheets. It is also useful to read the technical information “working with epoxy”. You can find all these documents at the bottom of this page under downloads.

Downloads

Public downloads

  🇳🇱 🇫🇷 🇬🇧 🇩🇪
TDS

NL

FR

EN

DE

MSDS A

NL

FR

EN

DE

MSDS B

NL

FR

EN

DE

Contact our Sales Team and order now.

Contact our Sales Team and order now.