Sidec will be closed on Montag 20 May (Pentecost Monday).
Before proceeding to apply Turbodec Basecoat, verify that the primer layer (EP-Rapid Primer) and any installed plinths are dry. The floor temperature determines which type of Basecoat (LT or HT) should be used. Be sure to measure this in advance.
If the primer layer is completely dry, the excess broadcast gravel must first be completely removed. Brush this away and then use a vacuum cleaner to remove the last loose broadcast gravel from the floor. Then check again if the primer is well broadcast everywhere.
The broadcast layer must always be provided with a sealing coat. Leaving the floor exposed
Clean the used tools with Cleaner EP, isopropanol or acetone. Cured product residues must be removed mechanically.
Shelf life: 12 months in closed and original packaging when stored in a cool and dry place (10-25°C).
Turbodec Broadcast Gravel should be stored in a dry, cool and dark place.
These brief installation instructions are here to get you started quickly during installation. However, it is important to first read the technical data sheet and to take note of the safety data sheets